Vanessa Enterprise Ltd
House-09, Road-04, Section-04, Uttara, Dhaka, Dhaka Metro.

Project Key Specifications

Official engineering contract parameters & execution scope

Certified Completion
Project Title

Vanessa Enterprise Ltd

Engineering Category

Garments Industry

Facility Location

House-09, Road-04, Section-04, Uttara, Dhaka, Dhaka Metro.

Execution Scope & Engineering Deliverables
Design Drawing of Fire Safety Plan/ NOC consist with below design :
a) Master Plan Drawing of Fire Protection Layout including of all Building Structural Details.
b) All Building Fire Protection Systems Drawing.
c) All Building Fire Detection Systems Drawing.
Refuge Area Drawing .
d) Lightining Protection Systems (LPS) .
e) Pump Room & Reservoir Details .
f) Schematic Diagram of Fire Hydrant /Protection Systems.
g) Gas Suppression Systems Design of Utility Building .
h) SLD (Single Line Diagram) of Substation .
i) Fire Separation Drawing .
j) Evacuation Plan Drawing.
k) Mechanical Ventilation Drawing of Basemen
l ) Booklet Development :
a. information with current front View of Building ,
b. Substation, Transformer, LT/HT Panel ,PFI panel, Generator, Broiler Technical Datasheet with Picture,
c. Total Fire Systems Equipment Qty. & Technical Specification
d. Maintenance Team full Information .
e. Guideline For Fire Safety Issue.

Project Overview & Execution Scope

Comprehensive engineering consultancy and deployment details

Design Drawing of Fire Safety Plan/ NOC consist with below design :
a) Master Plan Drawing of Fire Protection Layout including of all Building Structural Details.
b) All Building Fire Protection Systems Drawing.
c) All Building Fire Detection Systems Drawing.
Refuge Area Drawing .
d) Lightining Protection Systems (LPS) .
e) Pump Room & Reservoir Details .
f) Schematic Diagram of Fire Hydrant /Protection Systems.
g) Gas Suppression Systems Design of Utility Building .
h) SLD (Single Line Diagram) of Substation .
i) Fire Separation Drawing .
j) Evacuation Plan Drawing.
k) Mechanical Ventilation Drawing of Basemen
l ) Booklet Development :
a. information with current front View of Building ,
b. Substation, Transformer, LT/HT Panel ,PFI panel, Generator, Broiler Technical Datasheet with Picture,
c. Total Fire Systems Equipment Qty. & Technical Specification
d. Maintenance Team full Information .
e. Guideline For Fire Safety Issue.